Real projects.
Real results.
Browse a selection of our completed estimates across trades and project types. All samples are redacted for client confidentiality. Request any sample directly — we’ll send it to your inbox within the hour.
10-Storey High Rise Office Building
Comprehensive quantity takeoff and cost estimation for a 10-storey commercial office building covering full structural works. Scope included reinforced concrete elements (foundations, columns, beams, slabs, and staircases), structural steel components, and associated structural systems.
Community College Renovation
Covering structural modifications, interior refurbishments, and system upgrades. Scope included assessment of existing conditions, demolition quantities, and new work such as concrete repairs, partition systems, finishes, and associated structural elements.
Grand Center – Electrical Systems
Electrical systems in a grand commercial center, covering power distribution, lighting systems, low-voltage infrastructure, and associated components. Scope included measurement and quantification of conduits, cabling, panels, fixtures, and equipment based on construction drawings and specifications.
Military Estates — Complete Site Package
Detailed quantity takeoff and cost estimation for site works of a large-scale commercial development, including earthworks, grading, excavation and backfilling, sub-base preparation, and external infrastructure. Scope also covered pavements, curbs, drainage systems, and utility trenches.
New Residential Building — Lumber Package
Detailed quantity takeoff and cost estimation for lumber works in a residential building, covering structural and non-structural wood components. Scope included framing systems such as studs, joists, rafters, beams, and sheathing, along with associated accessories.
New Restroom – General Construction
works in a restroom project, including demolition, partitions, finishes, ceilings, doors, and accessories. Scope covered material quantification for drywall systems, tiling, flooring, painting, and installation of fixtures and fittings as per project drawings and specifications.
Clean, structured,
bid-ready BOQs
Every estimate we deliver follows a consistent, professional format — organized by CSI division, itemized by trade, and ready to drop straight into your bid submission.
| Item | Description | Unit | Qty | Rate | Total |
|---|---|---|---|---|---|
| 03.10 | Concrete Formwork — Slab | SF | 12,450 | $4.20 | $52,290 |
| 03.20 | Reinforcing Steel — #4 Rebar | LB | 48,200 | $1.85 | $89,170 |
| 03.30 | Cast-in-Place Concrete — 4000 PSI | CY | 842 | $185.00 | $155,770 |
| 03.40 | Concrete Finishing — Trowel Finish | SF | 12,450 | $2.10 | $26,145 |
Don’t see your
trade or project type?
We’ve completed 500+ projects across all construction trades. Send us your drawings and we’ll deliver a free sample takeoff — no commitment required.
Get this sample
sent to your inbox
Fill in your details and we’ll send you the redacted sample estimate within 1 hour — completely free.
Your details are only used to send you the requested sample — nothing else.
Request received!
Thanks — we’ll send your sample estimate to your inbox within the next hour. Check your spam folder if you don’t see it.